Description |
Inspection 1. Connect the GDS on the Data Link Connector (DLC). 2. Turn the ignition switch ON. 3. Measure the output voltage of the APS 1 and 2 at C.T and W.O.T. AcceleratorPositionOutput Voltage (V)APS1APS2C.T0.7 ...
Specification Pressure [kPa (kgf/cm?, in H2O)Output Voltage (V)-6.67 (-0.068, -26.8)0.502.5+6.67 (0.068, 26.8)4.5 ...
General 1. Basically, all measurements in this manual are taken with a tracking gauge. 2. When a measuring tape is used, check to be sure there is no elongation, twisting or bending. 3. For measuring dimensions, both projected dimension and actual-measurement dimension are used in this manual. Measurement ...
Inspection Power Window Main Switch Inspection 1. Disconnect the negative (-) battery terminal. 2. Remove the front door trim panel. (Refer to the BD group - "Front door") 3. Disconnect the connector from the switch. 4. Check for continuity between the terminals in each switch position according to the ...