Description The oil pump main relay is installed within the HEV fusible link box of the engine room. When the Oil Pump Unit (OPU) triggers the oil pump main relay, electric current needed to operate the ...
Replacement 1. Remove the condenser, and then remove the bottom cap (B) with L wrench (A) from the condenser. Tightening torque : 20~25N.m (2.0~2.5kgf.m, 14.5~18.2lb-ft) 2. Remove the desiccant (A) from condenser using a long nose plier. Check for crumbled desiccant and clogged bottom cap filter. 3. ...
Inspection Glass Antenna Test 1. Wrap aluminum foil (A) around the tip of the tester probe (B) as shown. 2. Touch one tester probe to the glass antenna terminal (A) and move the other tester probe along the antenna wires to check that continuity exists. Glass Antenna Repair To make an effective ...