Inspection |
1. |
After disconnecting the vapor hose from the PCV valve, remove the PCV valve. |
2. |
Reconnect the PCV valve to the vapor hose. |
3. |
Run the engine at idle, then put a finger over the open end
of the PCV valve and make sure that intake manifold vacuum can be felt.
|
4. |
If the vacuum is not felt inspect PCV operation, if operating correctly clean or replace the vapor hose. |
Schematic Diagram ...
Operation Principle ...
High Voltage Shutoff Procedure Shut off the high voltage circuit before doing any work related with the high voltage system (Battery Pack Assembly, Power Relay Assembly, HPCU, BMS ECU, Hybrid Drive Motor, Inverter, HSG, LDC Power Cable, Electric Compressor, and so on). 1. Turn the ignition ...
Specification Pressure (kPa)Output Voltage (V)20.00.79 46.71.84101.34.0 ...