Inspection |
1. |
Turn the ignition switch OFF. |
2. |
Disconnect the PCSV connector. |
3. |
Measure resistance between the PCSV terminals 1 and 2. |
4. |
Check that the resistance is within the specification.
|
Removal |
1. |
Turn the ignition switch OFF and disconnect the battery negative (-) terminal. |
2. |
Disconnect the purge control solenoid valve connector (A). |
3. |
Disconnect the vapor hoses (B) from the purge control solenoid valve. |
4. |
Remove the valve from the bracket in the direction of the arrow. |
Installation |
|
1. |
Install in the reverse order of removal.
|
Circuit Diagram ...
Description Continuous Variable Valve Timing (CVVT) system advances or retards the valve timing of the intake and exhaust valve in accordance with the ECM control signal which is calculated by the engine ...
Inspection 1. Connect the GDS on the Data Link Connector (DLC). 2. Turn the ignition switch ON. 3. Measure the output voltage of the APS 1 and 2 at C.T and W.O.T. AcceleratorPositionOutput Voltage (V)APS1APS2C.T0.7 ~ 0.80.29 ~ 0.46W.O.T3.85 ~ 4.351.93 ~ 2.18 ...
Inspection 1. Check that the red light flickers when the door lock or unlock button is pressed on the transmitter. 2. Remove the battery (A) and check voltage if the red light doesn''t flicker. Standard voltage : 3V 3. Insert the battery (A) into the tester (09954-2P100). 4. Push the test button and ...